-

WEST AVENIDA PALIZADA, CALLE SEVILLE & LOMA LANE STORM DRAIN, STREET & WATER REHABILITATION PROJECT, SAN CLEMENTE, CALIFORNIA

Kabbara Engineering was selected by the City of San Clemente to prepare plans, specifications and estimates for the improvement of the subject streets which included West Avenida Palizada from El Camino Real to Calle Seville. Drainage improvements for this project included removal and reconstruction of the existing catch basin located at 224 West Avenida Palizada and the construction of 8 foot wide concrete cross gutters to the catch basins at 224 and 248 W. Avenida Palizada. Project included a Geotechnical evaluation and a preliminary design report with pavement alternatives with cost estimates for each, and recommendations for pavement reconstruction, sidewalk and curb and gutter reconstruction. Project also included water improvements, traffic signing and striping, and traffic signal inductor loop replacement. intersections.