-

LAKEWOOD BOULEVARD WATER TRANSMISSION MAIN, DOWNEY, CALIFORNIA

Kabbara Engineering prepared the Plans, Specifications and estimates for the construction of 3 miles of 20-inch diameter, 1600 l.f. of 16-inch and 3100 l.f. of 12-inch cement lined ductile iron pipe for the Pipe Water Transmission Main in Lakewood Boulevard (State Highway 19) and Rosecrans Avenue. Kabbara Engineering performed the field topographic survey using G.P.S. and utilized aerial mapping (by our subconsultant) for plan preparation. Project included three large diameter (16″-20″) connections to Metropolitan Water District Main lines and Caltrans encroachment permit processing. Also included design and coordination with Union Pacific Railroad Company for under crossing permit for directional boring.