Loading
Loading
We’re decking out your content!
248 West Avenida Palizada & Avenida Cabrillo Storm Drain Impovement and Detention
admin

Avenida Cabrillo detention project included construction of a dual 96" RCP with overflow structures… Read More

 
Park Avenue Storm Drain Improvements, Laguna Beach, California
admin

This project consisted of preliminary analysis and final design of Phase 1 and Phase 2 master plan s… Read More

 
TAFT AVENUE STORM DRAIN IMPROVEMENTS, ORANGE, CALIFORNIA
admin

Kabbara Engineering prepared preliminary alignment studies and final improvements plans, specificati… Read More

 
HIDDEN CREST DRAINAGE IMPROVEMENTS, LAGUNA NIGUEL, CALIFORNIA
admin

The purpose of this project is to mitigate the flooding problems which were occurring at the Hidden… Read More

 
HEWES STREET WIDENING & ALAMEDA CHANNEL EXTENSION, ORANGE, CALIFORNIA
admin

he City of Orange retained Kabbara Engineering to prepare improvements plans, specifications, and co… Read More

 
LOS FELIZ STORM DRAIN IMPROVEMENTS MTD NO. 1579, GLENDALE, CALIFORNIA
admin

Kabbara Engineering prepared plans, specifications and construction cost estimates for the Los Feliz… Read More

 
ORANGE PARK ACRES STORM DRAIN SOUTH REACH, ORANGE, CALIFORNIA
admin

Orange County Public Works retained Kabbara Engineering to prepare construction plans, specification… Read More

 
WALNUT STREET DRAINAGE IMPROVEMENTS, COSTA MESA, CALIFORNIA
admin

Kabbara Engineering developed preliminary alignment studies, and Hydrology and Hydraulic analyses of… Read More

 
RIVIERA STORM DRAIN RECONSTRUCTION PROJECT, SAN CLEMENTE, CALIFORNIA
admin

Kabbara Engineering prepared performed the field and aerial topography for the project site and prep… Read More