Loading
Loading
We’re decking out your content!
TRUNK SEWER CONSTRUCTION INDUSTRY STREET, GARDEN GROVE, CALIFORNIA
admin

Design of  667 l.f. of 18″ vcp sewer line. This project was multi-jurisdictional, requiring review and approval by the City of Garden Grove, Garden Grove Sanitation District and Orange County Sanitati… Read More

WATER IMPROVEMENTS FOR LAMBERT, HACIENDA & CYPRESS, LA HABRA, CALIFORNIA
admin

Replacement of existing 4” and 6” water lines with 8” and 10” ductile iron pipe water lines and fittings, hot tapping of existing water lines, fire hydrant installation, jacking 18” pipe for water lin… Read More

ROSEMEAD BOULEVARD WATER MAIN IMPROVEMENTS, PICO RIVERA, CALIFORNIA
admin

Project included approximately 11,700 l.f. of new water main construction and special connections to existing ACP lines in Rosemead Boulevard, in the City of Pico Rivera Read More

LAKEWOOD BOULEVARD WATER TRANSMISSION MAIN, DOWNEY, CALIFORNIA
admin

Plans, Specifications and estimates for the construction of 3 miles of 30-inch diameter, 1600 l.f. of 16-inch and 3100 l.f. of 12-inch cement lined ductile iron pipe for the Pipe Water Transmission Ma… Read More

TUSTIN ZONE 3 WATER REPLACEMENT PROJECT, TUSTIN, CALIFORNIA
admin

This project consists of the replacement of the existing Zone 3, 6″ water distribution main in E. Sk… Read More

 
3RD STREET WATER DISTRIBUTION MAIN REPLACEMENT, DOWNEY, CALIFORNIA
admin

This project consisted of the engineering design and preparation of plans, specifications and estima… Read More