Avenida Cabrillo detention project included construction of a dual 96" RCP with overflow structures… Read More
This project consisted of preliminary analysis and final design of Phase 1 and Phase 2 master plan s… Read More
Kabbara Engineering prepared preliminary alignment studies and final improvements plans, specificati… Read More
The purpose of this project is to mitigate the flooding problems which were occurring at the Hidden… Read More
he City of Orange retained Kabbara Engineering to prepare improvements plans, specifications, and co… Read More
Kabbara Engineering prepared plans, specifications and construction cost estimates for the Los Feliz… Read More
Orange County Public Works retained Kabbara Engineering to prepare construction plans, specification… Read More
Kabbara Engineering developed preliminary alignment studies, and Hydrology and Hydraulic analyses of… Read More
Kabbara Engineering prepared performed the field and aerial topography for the project site and prep… Read More